Route search, alignment, typical cross-sections, cross-drainage and sheets in one seat — built around IRC hill-road practice, from the survey you already have.
Send us a DTM or point cloud with a start and end point. We'll run it with you live.
Give it a start, an end and your design criteria. AutoRoads searches the whole terrain and returns genuinely different routes that respect your radius and grade limits, then lands the chosen one as a design alignment with nothing to re-digitise.
Greenfield is included in AutoRoads Spatial and AutoRoads Aero.

The options report: criteria, comparison and normative cost from the MoRTH reference or your own rates — a feasibility deliverable in itself.
AutoRoads applies your template at every station against the real ground, measures both sides, and divides the corridor into numbered stretches. The same arrangement always gets the same TCS number. You review, adjust and issue.

TCS Definition: every station, its template, depths, toes and class, with profile and section side by side.
Each of these runs from the same analysis, so your schedule, walls, structures and cost all agree.
Move an IP and the grades, curve warnings and corridor toes follow. Design standards change by chainage, so one alignment can pass through several terrain classes and design speeds.

Delineate the catchment on the same DTM and run the IRC chain: discharge, waterway, afflux, scour and foundation level. You get an editable workbook per structure, with live formulas.

The same model produces plan and profile sheets with view frames, a band designer and title blocks, plus cross-section sheets at any interval. Change the design and regenerate.






Alignment, TCS, structures, hydraulics and sheets. No point clouds or Greenfield.
Ask for a quoteEverything in AutoRoads, plus Greenfield route search and the full point-cloud platform.
Book a demoEverything in AutoRoads Spatial, plus drone photogrammetry in the same seat.
Ask for a quoteA design-standard library covering IRC hill-road standards (IRC:SP:48, IRC:52, IRC:73), AASHTO and comparable codes. Terrain class and design speed can change by chainage.
No. It gives you feasible, comparable options and a starting alignment. Your engineers review and finish the design. Cost is normative, for comparing options, not a project estimate.
It does the analysis and first schedule. Walls and structures are proposals; cross-drainage is only ever suggested until you accept it, and your edits are kept.
Yes. Send us a DTM or point cloud with a start and end point, and we'll walk through it with you on a demo.
Send a start point, an end point and your survey. We'll show you the routes and the TCS live.